Traffic deck membrane removal with Greensolv 273M

Membrane type & Substrate

  • Neoprene primer.
  • Coal Tar epoxy.
  • Thickness : 60 to 160 mils.
  • Substrate : concrete.

Reason for stripping

  • After several years of use, the traffic deck membrane needed to be changed in order to prevent the water from infiltrating the concrete.

Application

  • 20kg per 30m² / 5 Gal. per 300 sq.ft (28 mils).
  • 1 application of Greensolv 273M covered with a plastic sheet.
  • Removal of the membrane with a scraper, then a surface preparation is required.

Results

  • 57,000 sq.ft. of traffic deck membrane were removed in 30 days.
  • Only small sections of the parking were closed at any time during the repairs.
  • Removal up to 5000 sq.ft. a day with 4 workers.

Conclusion

  • Did not damage the concrete.
  • No water.
  • Most cost effective method.
  • Rapid stripping procedure.

Copyright © 2008 Greensolv Inc. All rights reserved.